YearClient/LocationSizeContract

Type

Brief

Description

2021-2024PPX biorefinery,

Illinois, USA

Plant120000 t/yEPCRenovation design and procurement
2018-2019LA Authority and Kiewit, Los Angeles, CANAEPRenovation and upgrade wastewater treatment plant.
2017-2018Zhong Jia Technology Co, Ltd, ChinaProcess

50 000 ton

FS and EProcessing Plant Fuels
2017-2018Barnaby Refinery, Vanquever, Canada102,000 BPDEPRenovation project for desulphurization and hydro treatment
2017Zhong Jia Technology Co, Ltd, China20 t/hEPCMobile Oil Sludge Processing Unit
2017

 

Iskander Oil, Kazakhstan186 000 ton/yearЕPCondensate Processing Plant
2016 -2017RRCC refinery, Afghanistan3,000 BPDEPCrude Oil processing plant
2011-2014PeroxyChem, México

 

Peroxide Plant RenovationEPTo increase capacity to 12 000 t/y
2011-

2012

Novatek, RussiaMethanol Plant

500000 t/y

EPCProject with Davy Process| Johnson Mathew.
2009-20102017 -2019Biomass to Fuels for NREL5000 t/y Demo UnitEPC

Abbreviations:

FS – Feasibility Study;

FS RD – Research, Laboratory Works, Feasibility Study

FEED – Front End Engineering Design

EPCM – Project management

LeMar Projects with Chemex from 1996 to 2013 years

YearClient/LocationSizeBrief Description
2009-2011Husky Energy, Inc.
Lloydminster, Alberta
45,000 bpd refineryHFO desulphurization and facility de-bottlenecking and upgrades
2007-2009Fuel Processing Operators
El Mirage, Arizona
22,800 bpdUpgraded existing facility process, fuel upgrades with diesel desulphurization with commissioning into operations.
2006-2008Niger Delta Petro
Ogbelle, Nigeria
15,000 bpdCrude oil processing plant, supplied new surplus and turnkey installed.
2004-2006Golden Gate Petroleum
Sparks, Nevada
68,000 bpdFabrication and construction of a Transmix Distillation Unit and Products Load Rack
2003-2004SibOil, Russia30,000 bpdCrude Oil HI-TEC 10-30 supplied and erected in Siberia.
2002-2003Caspyi 1 Refinery

Russia

3,000 BPDTurnkey installed at site in Bulgaria.
2002Bulgaria26,000 bpdTurnkey installed at site in Bulgaria.
2002Sinclair Refinery
Sinclair, Wyoming
66,000 bpd refineryProvided turnkey installation services to upgrade production capabilities, LINDE hydrogen plant upgrade, fuel treatment and desulphurization upgrade.
2000Ergo, Canada6,000 bpdRefurbished and shipped a Val Verde Crude Oil Distillation Unit to Canada